The primary physical act was the removal of boundaries, both physical and conceptual, that segregated the drainage easement from surrounding ecologies, both human and natural. This included the deconstruction of the trapezoidal concrete drainage channel; once this dangerous canyon was removed, fences separating the corridor from surrounding residential neighbourhoods could also be removed.
PROJECT TEAM
REALMstudios, Alluvium Consulting, E2DesignLab
CLIENT
Melbourne Water